Wickham Accommodation Expansion Project (Current). Electrical Engineering design services to Serling Consulting and Thinc Projects for RTIO for new Wickham South Stage 1 accommodation expansion program (approx. 270 residential lots) including NBN Co communications pit and pipe

Wickham Lodge and Cajiput FIFO sites power upgrade, Roebourne-Point Samson Road intersection aerial undergrounding and intersection lighting to MRWA standards, Waqllcott Drive aerial removal and undergrounding

Newman Town Centre Upgrade and Revitalisation (Current). Electrical Engineering design services to JDSI Consulting Engineers, BHP Billiton and Shire of East Pilbara for revitalisation and expansion of Newman Town Centre, including extensive aerial removal and undergrounding, roadway and specialist lighting and power capacity upgrade

North Whites Beach, Barrow Island HDD Project. Power generation, power and communications reticulation and external site lighting for the horizontal direct drilling land base at Barrow Island for Lucas Operations. Included 6-off distributed diesel generator sets supplying power to numerous buildings and facilities, and 10-off mobile lighting towers

Jandakot Park Development. Redevelopment of Jandakot Airport land to establish a large scale commercial, business and industrial precinct. Project included new dual 10MVA supplies and 22kV reticulation to numerous transformer substations, and extensive custom designed street lighting.

Worsley Alumina Construction Camp (3E as JCE 2009). 60-room temporary fly-camp with JDSi Consulting Engineers. Comprises 15-off 4-person SPQ’s, 2-off Laundries, 2-off kitchen diners, sewage treatment plant.

Hope Downs Accommodation Village (3E as JCE/WCE Consortium 2006/07). New 700-room camp for Rio Rinto and Calibre Engenium. Included all ancillary facilities, drymess, kitchen, sewer pump station. 3E staff were involved in the design of 11kV high voltage system to various transformers strategically located around the camp and numerous associated low voltage switchboards used to distribute low voltage to accommodation units. Included connection to temporary Generators until permanent mains supply was installed. Construction completed, camp commissioned and operational.

Searipple Accommodation Village, Karatha (3E as JCE 2008). 164-room expansion project with JDSi Consulting Engineers. Comprised 18-off 8-person staff quarters, 5-off 4-person staff quarters, 3-off laundry blocks, 200-man kitchen and bin wash area, and carpark expansion.